PROJECT COST Details Appoximatetly Cost (million bath) Land Accquistion 656.20 Civil Works 1,792.44 M&E Work 930.89 Rolling Stocks 440.00 Consultancy Fee 94.90 Provisional Sum 158.17 Total 4,072.60   Source: The project consultant for the MRT Pink line Extension (Spur line) project, Si Rat - Muang Thong Thani section: Monthly Progress Report at July 2022
Depot The MRT Pink Line extension shares the same depot with the MRT Pink Line Project, Khae Rai - Min Buri.
Station There are two stations; the 1st station is the Impact Muang Thong Thani (MT01), and the 2nd station is the Lake Muang Thong Thani (MT02).
Alignment     Connected to the MRT Pink Line at the Muang Thong Thani Station (PK10) and run along the Chaeng Wattana - Pak Kret 39 road to end at the lake in the Muang Thong Thani zone; the length of this alignment is approximately 3 kilometers.
CHARACTERISTICS The MRT Pink Line Extension was designed as a minor mass transit system (Feeder) in terms of the elevated straddle monorail.
BACKGROUND The Cabinet meeting on December 4th, 2018 acknowledged the Commission for the Management of Land Traffic’s resolution in the 2/2018 meeting on October 17th, 2018, to include the MRT Pink Line Extension (Spur Line) Project; Si Rat - Muang Thong Thani section, in the Mass Rapid Transit Master Plan (M-MAP).