Alignment
04 April 2567 Connected to the MRT Pink Line at the Muang Thong
Thani Station (PK10) and run along the Chaeng Wattana - Pak Kret 39 road
to end at the lake in the Muang Thong Thani zone; the length of this
alignment is approximately 3 kilometers.