Mass Rapid Transit Authority of Thailand
Mass Rapid Transit Authority of Thailand
ภาษา
เรายกระดับชีวิตเเมือง

MRTA inspects construction sites of the MRT Yellow Line Project: Lat Phrao – Samrong Section for their compliance with mitigation measures on environmental impacts

Mass Rapid Transit Authority of Thailand (MRTA) by Environment Division, MRT Project Development Department inspected the compliance with mitigation measures on environmental impacts in construction sites of the MRT Yellow Line Project: Lat Phrao Samrong Section from Lat Phrao Station on Lat Phrao Road to Samrong Station on Thepharak Road. The inspection activities consisted of cover of soil, sand, and construction waste before use or moving out of the area following measures on reduction of PM 2.5, temporary walkway substituting for footpath to facilitate pedestrian during the construction work is taking place in the area of the original footpath, installation of canvas fences around the construction site to clearly show the boundaries of the project construction area, installation of sound absorbing material under Samrong Station, as well as instructing workers to adhere strictly to mitigation measures on environmental impacts.